Manufacturing · Production planning
The plan is rebuilt by hand every time an order moves or a machine goes down.
The plan updates itself, and shows what each change costs before you accept it.
A machine stops and the day is still planned.
Industry
One machine going down should not cost you two days of replanning.
Manufacturing · Production planning
The plan is rebuilt by hand every time an order moves or a machine goes down.
The plan updates itself, and shows what each change costs before you accept it.
A machine stops and the day is still planned.
Manufacturing · Goods receipt
Delivery notes are typed into the system a second time by hand.
Documents are read and posted the moment they arrive.
Receiving closes the day it happens.
Manufacturing · Maintenance
Engineers write up jobs on paper and nobody compares one to the next.
Every job is logged, and repeat failures are grouped by machine.
You replace the part before it stops the line.
Manufacturing · Supplier quotes
Comparing three quotes means three formats and an afternoon in a spreadsheet.
Quotes are read and lined up side by side, like for like.
You buy on a price you can actually compare.
Manufacturing · Certificates
Material certificates are chased by email and filed by hand, then hunted for at audit.
Certificates are collected, checked and filed against the batch as it runs.
An audit takes an hour, not a week.
Talk to us
No charge and no obligation. We look at how your work actually runs and name the three processes worth fixing first, with what each is costing you now.
Talk to us